• Shoe Sole Injection Molding Making Machine Polyurethane PU
  • Shoe Sole Injection Molding Making Machine Polyurethane PU
  • Shoe Sole Injection Molding Making Machine Polyurethane PU
  • Shoe Sole Injection Molding Making Machine Polyurethane PU
  • Shoe Sole Injection Molding Making Machine Polyurethane PU
  • Shoe Sole Injection Molding Making Machine Polyurethane PU

Shoe Sole Injection Molding Making Machine Polyurethane PU

Condition: New
Certification: GS, CE, ISO9001
Power Supply: Hydraulic
Applicable Material: Fabric, Rubber, Plastic, Genuine Leather, Artificial Leather
Function: Shoemaking Line
Delivery Time: Shipped in 15 Days After Payment
Customization:

Contact Supplier

Gold Member Since 2018

Suppliers with verified business licenses

Trading Company

Basic Info.

Model NO.
yl
Computerized
Yes
Warranty
One Year
After-Sales Service Provided: 
Engineers Available to Service Machinery Overseas
Principle
Low-Pressure Type
Production
25000pairs/Day
Transport Package
Container/LCL
Specification
customized
Trademark
YILIAN
Origin
China
HS Code
84532000
Production Capacity
200sets/Year

Product Description

Product Description

WENZHOU YILIAN INDUSTRIAL CO., LTD 
ADD: ROOM 614,6 BUILDING,WANGDA PLAZA,LONGWANG,WENZHOU, ZHEJIANG,CHINA
Tel:0086-577-55590380   Web: wzyilian.en.made-in-china.com


Details of Polyurethane Shoe Making Machine:

Shoe Sole Injection Molding Making Machine Polyurethane PU





Features:
We are professional and leading manufacturers of PU Pouring Machines based in Wenzhou,China and has more than 15 experiences.This conveyor type pu pouring machine is specialized for producing double color, doulbe density and transparent soles, dip shoes & slipper $ sandal, outsoles, closed shoes.This equipment is composed by low preasure pouring system, hyduraulic oil heating system, AC drive control system, microcomputer measuring data control system,auto cleaning system, cooling system etc.Conveyor Infrared-tube heating system can save 30% energy comparing to oil or electric heating. Its main characteristics are as follows:
1.A1B,A2B can make double color, double density
2.lastest head structure,makes less head material dropping ,less waste and save material
3.use digital temperature control system in the heating conveyor,less power consumption,save energy and more stable temperature control.
4.heating chamber cover whole coveyor making energy conservation and heating very fast.
5.Ac drive control and plc control system making data ,ratio,pouring time setting easily ,comparing to old head gear motor setting type.
6.mateial auto loading system
7.material tank use hydrulic oil heating system making material inside tank heating more evenly before pouring
8.head fast mixing speed making high quality and high production product.
NO. MODEL BH-PU09D SPECIFICATION UNIT
1 STATIONS 48/60/80 NOS
3 TOTAL POWER 52 KW
4 MIXING HEAD 8500 R.P.M
5 HEAD FIXED/MOVABLE  
6 MOULD OPENING/CLOSING MANUAL/AUTO -------
7 HEATING OIL CAPACITY 420 LITERS
8 PRODUCTION 25000/PRS 12 HRS
10 WEIGHT OF THE MACHINE 7.5 TONS
11 AC DRIVE 3 NOS.
12 TANK SIZE 250 LITERS
13 COVNEYOR HEATING SYSTEM Infrared-tube/electric pipe/gas/oil  
14 CLEARNING HEAD MANUAL/AUTO  
15 ALL MACHINE CAN BE CUSTOMIZED    





Why Choose Yilian PU Shoes machine

. 15 years manufacturer experiences and 8 years exporter experience
. Good after-sales service,has after-sales office aboard,help installation,trial and trainning.
. high quality and imported spare parts makes machine good quality

Q1: Are you trading company or manufacturer?
A:We have a factory.You are most welcomed to visit us for any requirement.

Q2: What's the delivery time?
A:Around 15-20 days after we receiving your deposit.

Q3:Can we use our own brand?
A:Yes,we can accept OEM also.

Q4: What about your machine warranty?
A:Our machine's warranty is 1 year (from the installation date)for all machine parts.

Q5: If the machine's spare parts broke, where can I get ?
A:We will give you free spare parts along with the shipment.
In case some parts is broken during warranty,you can easily get them in our aftersales office aboard.

Q6:What is the material of your product?
A:We use 304 stainless steel for our main machine,conveyor use 5mm thinckess carbon steel,very solid and strong.Key electic component we are imported.

Q7:Do you also supply mould?
A:YES,we have shoe mould factory.We can make mould as per customer design.

 

Send your message to this supplier

*From:
*To:
avatar Mr. Neil Wang
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now